Customized Precision steel Casting valve Parts
SHARE: 

We do OEM precision steel casting valve parts, we can product part strictly in according with your drawing or samples.100% meet the requirements of the designer.


Product :steel casting valve parts

Material:carbon steel,we can also custom produce you just need to tell us the chemical composition. 


Process: 

Drawings & samples→tooling design→tooling make→casting valve body→deburr→

drilling&threading→CNC machining→polishing→surface treatment→assembly→quality inspection→packing→shipping.


Machining: Turning,milling, reaming, boring, tapping etc 

Finish:Custom make as per your requirement, such as sandblast, vibration grinding, shot blasting, painting, powder coating, galvanization, etc 

Test equipment:CMM, optical spectrum instrument, micrometer, dial caliper, altimeter, all kinds of gauge etc.

Drawing file:PDF,IGS, SLD,DWG, PDF,DXF

Our advantage:Delivery fast! We will refund the tooling cost after your order quantity reach to a certain volume.


 

FAQ


1. Are you a factory or a trading company?


We have our own factory which produce valve,casting& CNC machining parts. We also have a trading company to deal with our export issue.

  

2. Will you sign a confidentiality agreement with us?


Yes, customer's privacy is protected

 

3. Can I get some samples?


We are honored to offer you samples for free, but you are expected to pay the tooling cost and courier cost and we will refund the tooling cost after your order quantity reach to a certain volume.


4. Can you make products without drawing?


No, we can only make products strictly follow customers' technical drawing. Because every spare parts must be install to the equipment.even little error can make big problem without technical drawing.


5. How does your factory do regarding quality control ?


We pay high attention to quality control Every product will be fully tested before the goods packed for shipment.   


6. How long is your products' lifetime?


Even the same products, different working condition has different lifetime. So please let us know your working condition,so that we can give you some technical suggestion.


7. What's the delivery time?


Usually the delivery time is 35 days. But we will arrange the Production Scheduling as customers' requirement.

Description:
Related Products